Dairyland Power Cooperative
Load Control Status:
Residential
Advisory Message (11/20/2024): Capacity Resource Fall Performance Event starting at 5PM
Load Class
Status
Typical Load
1A (Water Heater 4hr)
Uncontrolled
Small capacity residential water heaters
1B (Water Heater 6hr)
Uncontrolled
Large capacity residential water heaters
2 (Interruptible Heat)
Uncontrolled
Winter dual-fuel heat with 12hr backup
2W (Interruptible Heat Only)
Uncontrolled
Winter only dual-fuel heat with auto backup
3-DLY (Off Peak Storage 7-day)
Uncontrolled
Thermal storage systems peak avoidance 7 days/week
3-MF (Off Peak Storage M-F)
Uncontrolled
Thermal storage systems peak avoidance Mon-Fri
3-A1 (Off Peak Large Storage)
Uncontrolled
High capacity thermal storage systems peak avoidance Mon-Fri
3-WP (Off Peak Winter PM Storage)
Uncontrolled
Thermal storage systems winter only, evening only peak avoidance Mon-Fri
3-EV (Off Peak EV)
Uncontrolled
Electric vehicles peak avoidance Mon-Fri
4B (Interruptible Heat)
Uncontrolled
Winter dual-fuel heat with 4hr backup
last updated at 12:32AM 11/21/2024
NOTE: Some Load Class options may not be available in your area.