Dairyland Power Cooperative
Load Control Status:
Commercial-Industrial-Agricultural
Advisory Message (07/16/2018): *** Full Load Control / Peak Alert Will Occur Today Starting at 2:00 PM. (7/16/18) ***
Load Class
Status
Typical Load
Dairy Water Heaters (4A)
Interrupted
ends 06:55PM
dairy water heaters
C&I Generators (5A/AE1)
Interrupted
ends 06:05PM
automatic backup generators
C&I Peak Alert (5B)
Interrupted
ends 06:05PM
automatic or manual load reduction or generators
Grain Drying (24)
Interrupted
ends 06:05PM
low temperature grain dryers and grain handling facilities
Irrigation (8)
Interrupted
ends 06:05PM
irrigation pumps
last updated at 05:07PM 07/16/2018
NOTE: Some Load Class options may not be available in your area.