Dairyland Power Cooperative
Load Control Status:
Commercial-Industrial-Agricultural
Advisory Message (09/16/2024): Winter Load Control Season Starts 12/1/24. Economic Control Unlikely 9/16
Load Class
Status
Typical Load
4A (Dairy Water Heater)
Uncontrolled
High capacity, High Temp Dairy Water Heaters
AE-1 (Rate AE-1 Auto Standby)
Uncontrolled
C&I Generators enrolled in AE-1 rate & meeting requirements thereof
5A (Auto Standby Gen)
Uncontrolled
C&I Generators capable of load following & automatic transfer
5A-W (Auto Standby Gen - Winter)
Uncontrolled
C&I Generators capable of load following & automatic transfer - winter only
5B (Manual Standby Gen)
Uncontrolled
C&I Generators with limited load following or manual transfer, Peak Alert
5B-W (Manual Standby Gen - Winter)
Uncontrolled
C&I Generators with limited load following or manual transfer, Peak Alert - winter only
8 (Irrigation)
Uncontrolled
Outdoor Irrigation Systems - summer only
24 (Grain Drying)
Uncontrolled
Grain drying facilities
last updated at 09:22AM 09/20/2024
NOTE: Some Load Class options may not be available in your area.